Inspection History Details
Inspection Status: Correction Required
Inspection History: BUILDING PRE-SLAB
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 09/30/1998 | BUILDING PRE-SLAB | Correction Required | ADDTL COMMS - 1. WRAP ALL UNDER / INSLAB ABS. 2. REBAR NEEDS 1 1/2 CLEARANCE FROM PIPES. |