Permit: T98CM02883

Parcel: 133530350


Addresses:

540 S SPINEPOINT PL


Inspection Status: Correction Required

Inspection History: FRAMING

Permit Number - T98CM02883

Inspection Description - FRAMING

Inspection Status - Correction Required

Date Description Inspector Results Comments
10/29/1998 FRAMING Correction Required ADDTL COMMS - 1. DO NOT FORGET TO FIRE RATE 1 HR MATERIALS AT THE MANIBLOCK SYSTEM. 2. CHECK ALL PLUMBING LINE CLEARANCES FROM CAN LIGHTING OR HEAT SOURCES FOR MINIMUM 12. 3. ADDRESS 3 WCO AT 1ST FLOOR BATH.
10/22/1998 FRAMING Correction Required ADDTL COMMS - 1. CORRECT RIM JOIST THROUGHOUT. 2. ADD HARDWARE TO LANDING. 3. RECHECK AND WALK FRAMING RECHECK ALL FIREBLOCK! 4. CHECK ALL PLUMB CLEARANCES.
10/22/1998 FRAMING Not ready for Inspection NOT READY FOR INSPECTION
10/15/1998 FRAMING Correction Required ADDTL COMMS - 1. CONSULT WITH TRUSS ENGINEER ON TRUSSES MODIFIED TO FIT IN THE LR. 2. INSTALL POST UNDER BEARING TRUSS AT ENTRY. 3. REFER TO MFG REQUIRED SPECS FOR H2.5 CONNECTION TO TJI TYPE TRUSSES. 4. SHEAR TRANSFER AT INTERSECTING WALLS. 5. INSTALL BRACING PER TRUSS DRAWINGS. 6. PROVIDE TRUSS LAYOUT TO MATCH TRUSS DRAWINGS. 7. PROVIDE SPECIAL INSPECTION. 8. STOPPED INSPECTION.
10/15/1998 FRAMING Not ready for Inspection NOT READY FOR INSPECTION
10/12/1998 FRAMING Not ready for Inspection NOT READY FOR INSPECTION