Inspection History Details
Inspection Status: Correction Required
Inspection History: FRAMING
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 02/18/1999 | FRAMING | Correction Required | ADDTL COMMS - APPROVED AS NOTED 1. BRACE 1 1/2 FURRING STUDS AT MID SPAN. 2. COMPLETE MISC STUDDING AND HDRS. |