Inspection History Details
Inspection Status: Correction Required
Inspection History: REINFORCED MASONRY PRE-GROUT
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 12/29/1998 | REINFORCED MASONRY PRE-GROUT | Correction Required | ADDTL COMMS - COMPLETE LINTELS |
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 12/29/1998 | REINFORCED MASONRY PRE-GROUT | Correction Required | ADDTL COMMS - COMPLETE LINTELS |