Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO.
If you cannot find what you are looking for please
submit a records request.
Inspection Status: Not ready for Inspection
Inspection History: PLUMBING - FINAL
| Date |
Description |
Inspector |
Results |
Comments |
| 06/23/1998 |
PLUMBING - FINAL |
|
Not ready for Inspection |
NOT READY FOR INSPECTION |
| 06/02/1998 |
PLUMBING - FINAL |
|
Correction Required |
ADDTL COMMS - 1. CALL PLUMBING CONTRACTOR: REF TOTAL RUN, CROSS THREADED PIPE. 2. MAKE FIELD MEAS DBL CHECK TOTAL RUN. 3. SEE GAS DIAGRAM. |
| 06/02/1998 |
PLUMBING - FINAL |
|
Denied |
DENIED |
| 05/28/1998 |
PLUMBING - FINAL |
|
Correction Required |
ADDTL COMMS - 1. NEED A. PLUMB GAS LINE DIAGRAM WITH MEASURMENTS AND PIPE SIZES. B. COUPING 3/4 AT REAR OF HOUSE LOOKS TOO BE CROSS THREADED. C. 65,000 RANGE, 30,000 W/H , 100,000 ROOF TOP, GAS LINE LOOKS TOO SMALL. 2. SMOKE DETECTORS REQUIRED IN ALL BEDROOMS. 3. MIN CIR. SIZE 30AMP TO ROOF TOP. |
| 05/28/1998 |
PLUMBING - FINAL |
|
Denied |
DENIED |