Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO.
If you cannot find what you are looking for please
submit a records request.
Inspection Status: Correction Required
Inspection History: ROOF NAILING
| Date |
Description |
Inspector |
Results |
Comments |
| 03/04/1999 |
ROOF NAILING |
|
Correction Required |
ADDTL COMMS - NAILING OF SHEATHING OKAY. DO NOT LOAD WITH TILES UNTIL YOU HAVE RECEIVED A REMEDY FORM THE TRUSS MANUFACTURER FOR STRENGTHENING THE PORCH END OF THE TRUSS WHERE IT BEARS ON THE WALL AND HAVE COMPLETED THE CORRECTION REQUESTED. ADD TC (TRUSS CLIPS) OR EQUIVELANT TO ALLOW FOR DEFLECTION AT LOADING. |
| 02/26/1999 |
ROOF NAILING |
|
Correction Required |
ADDTL COMMS - CALL FOR ROOF NAILING AND EXTERIOR CLIP INSPECTIONS. RESERVE FRAMING FOR TIME WHEN ALL INTERMEDIATE TRADES CAN BE INSPECTED. PLEASE ARRANGE YOUR PLANS AND INCLUDE ALL NEEDED SHEETS. |
| 02/26/1999 |
ROOF NAILING |
|
Denied |
IVRS - Inspection 0999* |
| 02/19/1999 |
ROOF NAILING |
|
Denied |
IVRS - Inspection 0999* |