Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Inspection History Details
Inspection Status: Correction Required
Inspection History: BUILDING PRE-SLAB
Permit Number - T98CM01761
Inspection Description - BUILDING PRE-SLAB
Inspection Status - Correction Required
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
05/06/1998 | BUILDING PRE-SLAB | Correction Required | ADDTL COMMS - THE FOUNDATION PLAN SPECIFIES THAT THE FOOTINGS BE 12 INTO NATURAL SOIL MEASURED FROM NATURAL GRADE LEVEL NOT FROM TOP OF FORMING BOARD. ALSO STEEL IS REQUIRED IN INTERIOR BEARING FOOTINGS FOLLOW THE FOUNDATION. I AM INFORMED BY THE CONCRETE CREW ON SITE THAT THE SLAB ARE POST TENSION. INCLUDE PLANS PT.1 AND PT.2 IN THE INSPECTIONS SET. CALL FOR PRE-SLAB WHEN CABLES ARE INSTALLED. ALL SLABS. | |
05/06/1998 | BUILDING PRE-SLAB | Denied | DENIED |