Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you cannot find what you are looking for please submit a records request.

Permit: T98CM01680

Parcel: 111071680

Inspection Status: Correction Required

Inspection History: PLUMBING - ROUGH, SOIL

Date Description Inspector Results Comments
03/14/2000 PLUMBING - ROUGH, SOIL Correction Required ADDTL COMMS - 1. SOIL WATER TEST OK 2. OK TO BACKFILL AND CONCRETE 3. WILL REQUIRE REVISED AND APPROVED DRAWING FOR WASTE AND VENT SYSTEM BEFORE FINAL
03/10/2000 PLUMBING - ROUGH, SOIL Correction Required ADDTL COMMS - 1. SOIL WATER TEST OK 2. FERNCO COUPLING @ P.O.C. FOR BLDG. DRAIN WILL BE ACCEPTED DUE TO EXSISTING BLDG DRAIN MATERIAL IS NO LONGER MADE AND THERE IS NO TRANSISTION COUPLING FOR THIS APPLICATION. 3. OK TO BACKFILL TRENCH 4. WILL REQUIRE REVISED AND APPROVED DRAWING FOR WASTE AND VENT SYSTEM BEFORE FINAL 5. OK TO FLAT VENT SYSTEM DUE TO ELEVATION OF EXSISTING BLDG. DRAIN 6. NOTE: THIS INSPECTION IS FOR UNIT #3 ONLY
03/10/2000 PLUMBING - ROUGH, SOIL Partial Approval PARTIAL APPROVAL
03/04/2000 PLUMBING - ROUGH, SOIL Correction Required ADDTL COMMS - UNIT #2 WASTE AND VENT SYSTEM OK UNIT #2 WATER DISTRIBUTION OK UNIT #2 OK TO DRYWALL UNIT #1 AND 3 ROUGH PLDG AND INTERMEDIATE DENIED MUST HAVE 2 WASTE LINE FOR KIT SINK NOTE: YOU CAN ONLY WET VENT 2 FIXTURE UNITS ON A VERTICAL WET VENT 6. EXSISTING WATER CLOSET MUST HAVE MIN 2 VTR.
03/04/2000 PLUMBING - ROUGH, SOIL Partial Approval IVRS - Inspection 0000*