Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO.
If you cannot find what you are looking for please
submit a records request.
Inspection Status: Correction Required
Inspection History: EXT METAL CLIPS/EXT SHEATHING
| Date |
Description |
Inspector |
Results |
Comments |
| 06/03/1998 |
EXT METAL CLIPS/EXT SHEATHING |
|
Correction Required |
ADDTL COMMS - STRAP GARAGE DOOR HEADERS TO K- STUD ON INSIDE WILL CHECK AT FINAL FRAME. |
| 06/01/1998 |
EXT METAL CLIPS/EXT SHEATHING |
|
Not ready for Inspection |
NOT READY FOR INSPECTION |
| 05/28/1998 |
EXT METAL CLIPS/EXT SHEATHING |
|
Correction Required |
ADDTL COMMS - 1. SHEAR PANELS REQUIRED AT EACH BAY BETWEEN TRUSSES CHECK ALL! NAIL ROOF SHEATHING TO TOP. |
| 05/28/1998 |
EXT METAL CLIPS/EXT SHEATHING |
|
Denied |
DENIED |
| 05/27/1998 |
EXT METAL CLIPS/EXT SHEATHING |
|
Not ready for Inspection |
NOT READY FOR INSPECTION |
| 05/26/1998 |
EXT METAL CLIPS/EXT SHEATHING |
|
Correction Required |
ADDTL COMMS - 1. SHEAR PANELS BETWEEN TRUSSES THRU ROOF SHEATHING. BLOCKS AT TOP OF PANEL NEED TO BE FLUSH WITH BOTTOM OF SHEATHING AND NAILED PER SCHEDULE. PANELS REQUIRED AT EACH TRUSS ON SHEAR WALL EVERY 3RD AT BEARING WALL. 2. CHECK NAILING AT FRIEZE BLOCKING TO ROOF SHEATHING. 3. CHECK ALL EXT METAL CLIPS. |
| 05/26/1998 |
EXT METAL CLIPS/EXT SHEATHING |
|
Denied |
DENIED |