Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO.
If you cannot find what you are looking for please
submit a records request.
PRO is currently experiencing an outage. Some documents and records may not be available on PRO momentarily. We apologize for the inconvenience and are working to restore full access.
Inspection Status: Correction Required
Inspection History: STEM WALL/RETAINING WALL
| Date |
Description |
Inspector |
Results |
Comments |
| 05/19/1998 |
STEM WALL/RETAINING WALL |
|
Correction Required |
ADDTL COMMS - TO QUALIFY FOR ELECTRUC SERVICE PLEASE CORRECT THE FOLLOWING: 1. INSTALL A BOND WIRE FROM THE GROUNDING BUSHING ON THE SERVICE ENTRANCE CONDUIT TO THE NEUTRAL/ GROUND BAR OF THE LOAD CENTER SIDE OF THE PANEL. 2. CALL FOR NEW INSPECTIONS # 2050 AND 2060. 3. PRESENT YOUR PIMA COUNTY SEPTIC SYSTEM PERMIT AND PLANS SO I CAN VERIFY THE INSTALLATION. 4. EXPOSE 2 CORNERS OF THE FOOTING AND SLAB THIS IS REQUIRED TO VERIFY EXCAVATION AND REBAR. CALL FOR NEW INSPCTION AS NEEDED. |
| 05/19/1998 |
STEM WALL/RETAINING WALL |
|
Denied |
DENIED |
| 05/15/1998 |
STEM WALL/RETAINING WALL |
|
Denied |
DENIED |