Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you cannot find what you are looking for please submit a records request.

Permit: T98CM00506

Parcel: 111050330

Inspection Status: Correction Required

Inspection History: PLUMBING - GAS PRESSURE TEST

Date Description Inspector Results Comments
08/04/1999 PLUMBING - GAS PRESSURE TEST Correction Required ADDTL COMMS - 1. GAS PRESSURE TEST OK
08/03/1999 PLUMBING - GAS PRESSURE TEST Correction Required ADDTL COMMS - 1. COUPLING @ LAUNDRY RM MUST BE SPECIALTY COUPLING OR ABS COUP NOT NO HUB CUPLING 2. UNIT #2 GAS PRESSURE TEST UNDER 10 LBS
08/03/1999 PLUMBING - GAS PRESSURE TEST Denied IVRS - Inspection 0000*
07/28/1999 PLUMBING - GAS PRESSURE TEST Correction Required ADDTL COMMS - 1. C.O. THAT EXTENDS TO OUTSIDE OF BLDG MUST HAVE DIRECTIONAL FITTING. 2. GAS LINE DRAWING SHOWS 3/4 LINE FOR RANGE. PUT IN 3/4 OR GET PLAN CHANGE TO 1/2 3. NO ROOF JACKS FOR GAS LINE PENETRATIONS THRU ROOF
07/28/1999 PLUMBING - GAS PRESSURE TEST Denied IVRS - Inspection 0000*