Inspection Status: Correction Required
Inspection History: ROOF NAILING
| Date |
Description |
Inspector |
Results |
Comments |
| 10/13/1998 |
ROOF NAILING |
|
Correction Required |
ADDTL COMMS - SPOT CHECKED ONLY WAS COVERED. 1. 4X4 BEAM LOOKS TO BE TO SMALL SIZE WAS CHANGED ON PLAN WHO CHANGED IT SHOULD BE INTITIALED BY PLAN EXAMINER. |
| 08/26/1998 |
ROOF NAILING |
|
Correction Required |
ADDTL COMMS - 1. NEED TO MEET WITH PERSON DOING WORK |
| 08/26/1998 |
ROOF NAILING |
|
Denied |
IVRS - Inspection 0999* |
| 06/11/1998 |
ROOF NAILING |
|
Correction Required |
ADDTL COMMS - 1. YOU NEED 3 BEAMS TO CARRY ROOF DECK ON THE FRONT ONE AT THE BACK AND ONE AT THE RIDGE. BEAMS NEED TOO BE ON PLAN. 2. FOUNDATION YOU NEED INSPECTION ON FOOTINGS. MUST HAVE POST CONNECTED TO FTGS. 3. NON-BEARING WALL WAS IT INSPECTED (THE FOOTING?) B ANCHOR BOLTS. 4. EXT SIDING MUST BE NAILED AT 6 12. 5. BEAMS MUST HAVE A MIN BEARING OF 1 1/2. |
| 06/11/1998 |
ROOF NAILING |
|
Denied |
DENIED |