Inspection Status: Correction Required
Inspection History: REINFORCED MASONRY PRE-GROUT
| Date |
Description |
Inspector |
Results |
Comments |
| 01/20/1998 |
REINFORCED MASONRY PRE-GROUT |
|
Correction Required |
ADDTL COMMS - (8) 2ND 4 LIFT COVERED W/O INSP, (12) 3RD 4 LIFT & BOND BEAM APPROVED |
| 01/15/1998 |
REINFORCED MASONRY PRE-GROUT |
|
Correction Required |
ADDTL COMMS - PAT 18 @ 48 O.C. SPACING, 1/2 ANCHOR BOLTS @ 16 SPACING, NEED VERIFICATION OF ALL HORIZONTAL BOND BEAMS, ALL #4 BARS TO LAP MIN 20, NEED VERIFICATION OF 8 LIFT INSPECTION |
| 01/15/1998 |
REINFORCED MASONRY PRE-GROUT |
|
Denied |
|
| 01/14/1998 |
REINFORCED MASONRY PRE-GROUT |
|
Correction Required |
ADDTL COMMS - NO PLANS OR PERMITS. 8 LIFT INSPECTION? |
| 01/14/1998 |
REINFORCED MASONRY PRE-GROUT |
|
Denied |
|
| 12/19/1997 |
REINFORCED MASONRY PRE-GROUT |
|
Partial Approval |
1ST LIFT OK-MAIN HOUSE |
| 12/18/1997 |
REINFORCED MASONRY PRE-GROUT |
|
Correction Required |
ADDTL COMMS - NO PLANS/PERMITS. REBAR TO OVERLAP REBAR COMING OUT OF STEM WALL. REBAR MAX 4OC SPACING. STEMWALL PRE-GROUT INSPECTION? |
| 12/18/1997 |
REINFORCED MASONRY PRE-GROUT |
|
Denied |