Inspection Status: Partial Approval
Inspection History: FRAMING
| Date |
Description |
Inspector |
Results |
Comments |
| 03/26/1998 |
FRAMING |
|
Partial Approval |
PARTIAL APPROVAL |
| 01/08/1998 |
FRAMING |
|
Correction Required |
ADDTL COMMS - 1. NEED LAG BOLT IN BEAM @ W.END 2ND FL. 2. NEED WEB STIFFENERS IN TRUSSES 2ND FL SOUTH & EAST SIDES. |
| 01/08/1998 |
FRAMING |
|
Partial Approval |
SEE NOTES |
| 12/16/1997 |
FRAMING |
|
Correction Required |
ADDTL COMMS - 1. 10 A.B.S MISSING VARIOUS LOCATIONS. 2. X-BRACING TO BE INSTALLED PER MANUFACTURERS RECOMMENDATIONS. 3. NAILS MISSING @ HANGERS S. SICE. 4. MISSED A.B. @ END OF PLATE S. SIDE. 5. INSTALL BRACE @ END WALL. |
| 12/16/1997 |
FRAMING |
|
Partial Approval |
SEE NOTES |
| 12/15/1997 |
FRAMING |
|
Correction Required |
ADDTL COMMS - 1. SRT JOIST HANGER BACK TO BEAM @ CENTER. 2. NEED A.B. S @ CENTER WALL. 3. TIGHTEN A.B.S H.D. EASDT WALL. 4. NAILS MISSING A2.5 CLIPS @ WEAT SIDE. 5. TIGHTEN A.B. @ H.D. WEST WALL. 6. REPAIR DRYWALL @ FIREWALLS. |
| 12/15/1997 |
FRAMING |
|
Partial Approval |
SEE NOTES |
| 11/24/1997 |
FRAMING |
|
Partial Approval |
2ND FL. LIDS |
| 11/13/1997 |
FRAMING |
|
Partial Approval |
CORRIDORE LID |
| 11/07/1997 |
FRAMING |
|
Correction Required |
ADDTL COMMS - NORTH WING, OUTSIDE OF PERIMETER & CORRIDOR 1. FINISH NAILING. 2. CONFIRM SHINERS ARE FIXED. 3. CONFIRM 8 RIM NAILING. 4. FILL ALL HOLES @ HDWR. 5. COMP. HDWE. |
| 11/07/1997 |
FRAMING |
|
Partial Approval |
W/NOTES |