Inspection History Details
Inspection Status: Approved
Inspection History: FRAMING
Permit Number - T97CM00698
Inspection Description - FRAMING
Inspection Status - Approved
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
09/17/2002 | FRAMING | Approved | IVRS - Inspection 0000*REFERENCE IRC R323 & R324. PHYSCIAL BARGRESS TO TERMITES AND TREATMENT PROVIDED. SLABS ALSO 6" THICK PROVIDING ADEQUATE VAPOR BARRIER. | |
08/21/2002 | FRAMING | Partial Approval | IVRS - Inspection 0000*1.) SOLE PLATES OF PARTITION WALLS NOT TREATED LUMBER YOU MAY COVER ONLY IF YOU RECEIVE VARIANCE OR REPLACE WIHT TRENTED. 2.) LANDING AT REAR DOOR, LOWER LEVEL NEED TO HAVE STEPS IN COMPLIANCE. | |
05/24/2002 | FRAMING | Not ready for Inspection | IVRS - Inspection 0000*GET PLUMBING INTERMEDIATE UNCOVER WORK, INSTALL PROPER DRYER VENT. | |
11/17/2000 | FRAMING | Denied | 1. DO NOT SHEETROCK OR COVER WITH ANY MATERIAL UNTIL ALL INTERMEDIATES HAVE BEEN APPROVED. 2. 30" MIN. CLEARANCE REQ'D AT ALL WATER CLOSET. 3. AS PER MR. LIPINSKI-HE IS TO HIRE A LIC. ELECTRICIAN AND PLUMBER TO COMPLETE THESE TRADES. 4. STAIRS RISE AND RUN SHALL BE WITHIN 3/8" TOLERANCE. CHECK ALL STAIRS. 5. REVISE DRAWING TO CONFORM WITH AS BUILTS. HAVE APPROVED DRAWING ON SITE FOR INPSECTION, MEHANICAL, ELECTRICAL AND PLUMBING. | |
05/05/2000 | FRAMING | Denied | IVRS - Inspection 0999* | |
05/04/2000 | FRAMING | Not ready for Inspection | IVRS - Inspection 0000* | |
05/21/1998 | FRAMING | Not ready for Inspection | NOT READY FOR INSPECTION |