Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO.
If you cannot find what you are looking for please
submit a records request.
Inspection Status: Correction Required
Inspection History: FRAMING
| Date |
Description |
Inspector |
Results |
Comments |
| 06/13/1997 |
FRAMING |
|
Correction Required |
ADDTL COMMS - SCUTTLE HOLE, H20 HEATER FLUE THRU ROOF |
| 06/09/1997 |
FRAMING |
|
Correction Required |
ADDTL COMMS - REPLACE CUT OUT SHEAR PLY INTER WALL AT SHOWER, A.B. TO BE 24 O.C. REAR SHEAR WALL #9, SECURE MECH CHASE FRAMING 2ND FLOOR TOP OF STAIRS, ADD HEADER AT CUT STUD, ADD POSITIVE PITCH TO HORIZONTAL VENT ABOVE 1ST FLOOR HALL REAR BEDROOM, NEED SCUTTLE HOLE & LARGER PLATFORM, OR ACCESS CLOSE TO FURNACE FRONT, FINISH H20 FLUE THRU ROOF, SECURE ROMEX AWAY FROM FLUE |
| 06/09/1997 |
FRAMING |
|
Not ready for Inspection |
NOT READY FOR INSPECTION |