Permit Number - T97CM00429

Inspection Description - EXCAVATION/LAYOUT REBAR & ZON

Inspection Status - Correction Required

Date Description Inspector Results Comments
09/25/1997 EXCAVATION/LAYOUT REBAR & ZON Correction Required ADDTL COMMS - CONCRETE CO. SAID ENGINEERING DRWS. INTERPRETED AS OK.
09/23/1997 EXCAVATION/LAYOUT REBAR & ZON Correction Required ADDTL COMMS - STEEL FOR TOWER PIER OK AS NOTED. 1. CHECK THE NOTE RE:135 O BENDS ON...VERTS?
09/23/1997 EXCAVATION/LAYOUT REBAR & ZON Partial Approval SEE NOTES
08/26/1997 EXCAVATION/LAYOUT REBAR & ZON Correction Required ADDTL COMMS - 1. FOOTING FULL OF WATER. 2. NEED PLANS. 3. NEED LRTTER FROM ARCH., REVIEWED BY ELECTRICAL PLAN EXAMINER RE; PROXIMITY OF OVER HEAD CONDUCTORS & TOWER.
08/26/1997 EXCAVATION/LAYOUT REBAR & ZON Not ready for Inspection SEE NOTES
08/15/1997 EXCAVATION/LAYOUT REBAR & ZON Correction Required ADDTL COMMS - 1 @ SCREEN WALL @ ANTENNA TOWER 1. @HOSE DRY TOWER--1. MUCK OUT MUD AND WATER AND CLEAN REBAR. 2. PROVIDE LETTER FROM PROJECT ARCH. APPROVING THE LOCATION OF HOSE DRY TOWER. IN PROXIMITY TO EXISING OVER HEAD ELECTRICAL LINES APPROVED BY ELECTRICAL PLANS EXAMINER.
07/25/1997 EXCAVATION/LAYOUT REBAR & ZON Correction Required ADDTL COMMS - GRID LINE 1 A THRU F FTS. F-5 [4 TOTAL] EPOYXED REBAR @ GRID LINE 1-A & 1-F OK FTS. ALREADY POURED.