Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you cannot find what you are looking for please submit a records request.

Permit: T97BU02074

Parcel: 131072210


Addresses:

6282 E 28TH ST

Inspection Status: Correction Required

Inspection History: BUILDING - FINAL

Date Description Inspector Results Comments
03/13/1998 BUILDING - FINAL Correction Required ADDTL COMMS - ADD BRACES AT EACH 4 X 4 POST EASTSIDE
03/02/1998 BUILDING - FINAL Correction Required ADDTL COMMS - 1. FINISH NAILING HANGERS. 2. PLUMB STUCTURE AND ATTACH TO HOUSE. 3. CARPORT IS LEANING AWAY FROM THE HOUSE. 4. NAIL ROOF DECK 6 AT JOINTS 12 O.C. IN FIELD.
03/02/1998 BUILDING - FINAL Not ready for Inspection
02/20/1998 BUILDING - FINAL Correction Required ADDTL COMMS - FROM LAST INSPECTION SAME PROBLEMS. ASKED HECTOR LEYVA TO INTERPUT PROBLEMS IN SPAINISH TO HOME OWNER FRAMING NOT TO PLAN . 1. BEAMS BUILT UP ON BOTH BEARING SIDES, 2 2X8 REQ ONLY ONE INSTALLED. 2. CONNECTIONS NOT PER PLAN. 3. THE ROOF NOT SECURE.
02/20/1998 BUILDING - FINAL Not ready for Inspection NOT READY FOR INSPECTION
02/13/1998 BUILDING - FINAL Correction Required ADDTL COMMS - 1. NOT BUILT PER PLAN WOULD LIKE TO TALK WITH PERSON WHO DID THE WORK IN PERSON.
02/13/1998 BUILDING - FINAL Not ready for Inspection TOO MANY PROBLEMS