| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 12/13/2006 | GRADING - FINAL | Approved | Project complete | |
| 11/21/2002 | GRADING - FINAL | Denied | PLEASE CORRECT THE FOLLOWING DEFICIENCIES. 1. Storm drainage at the east perimeter, northeast and southeast corner of the project is not constructed to the specifications identified in the grading permit. 2. Trash enclosures are not constructed to the specifications identified in the grading permit. The 5"concrete filled pipes have not been provided and the screen walls are less than 6 feet in height. 3. Extruded curb is missing at the trash enclosure south of Building #4 4. Nine concrete wheel stops are missing at locations south and west of Building #3 5. Bicycle parking spaces have not been provided near Building #3. Please verify that all bicycle parking spaces have been provided throughout this project. 6. Stormwater erosion controls must be provided during the construction of the north portion of this site. |