Inspection Status: Not ready for Inspection
Inspection History: FRAMING
| Date |
Description |
Inspector |
Results |
Comments |
| 07/25/1997 |
FRAMING |
|
Not ready for Inspection |
|
| 06/13/1997 |
FRAMING |
|
Partial Approval |
|
| 06/12/1997 |
FRAMING |
|
Correction Required |
ADDTL COMMS - 1. COMPLETE HARDWARE ( ON ORDER WILL CHECK LATER). 2. PROVIDE FOR FULL BEARING UNDER THE WEST END OF THE RIDGE RAFTER. 3. OPEN THE O.S.B AT THE SCUPPERS FOR DRAINAGE AND PROVIDE LINERS. 4. PROVIDE NAILERS FOR THE BOTTOM OF THE LATH AT THE WEST SIDE OF THE WEST PARAPET. 5. THE PLANS SHOW SCUPPER TO THE SIDE. I SPOKE WITH THE HOME OWNER WHO WOUL LIKE THE NORTH SCUPPER (DRAINING TO THE EAST, CURRENTLY) TO DRAIN TO THE NORTH I WOULD CONSIDER IT A FAVOR IF YOU WOUD RELOCATE THIS SCUPPER. SHEATHING: 1. MISSED ONE LINE ON NORTH SET OF RAFTERS. 2. EDGES ON RAFTERS ARE TO BE NAILED AT 6 O.C. |
| 06/12/1997 |
FRAMING |
|
Denied |
DENIED |
| 06/11/1997 |
FRAMING |
|
Correction Required |
ADDTL COMMS - 1. NEED PLANS. 2. HOW IS THE RIDGE BEAM TO BE CONNECTED TO THE 4 X 8 BEAM? 3. HOW ARE THE 3 BEARING BEAMS TO BE SECURED AT THE EXISTING RESIDENCE. 4. CRICKETS? |
| 06/11/1997 |
FRAMING |
|
Denied |
DENIED |