Inspection Status: Correction Required
Inspection History: EXCAVATION/LAYOUT REBAR & ZON
| Date |
Description |
Inspector |
Results |
Comments |
| 05/18/1998 |
EXCAVATION/LAYOUT REBAR & ZON |
|
Correction Required |
ADDTL COMMS - 1. NO LAG BOLTS FROM VEGA POST TO WALL. 2. STEMWALL AND POST ANCHOR DOESNT MATCH DRAWINGS. 3. BEAMS NOT LAGGED TO CORBLE. 4. FALSE VEGA AND PARAPET NORTH SIDE ABOUT TO FALL OFF. 5. CORBELS AND BEAM TO SHORT EAST SIDE OF STEPS. 6. CANT SEE LAG BOLTS FROM CORBEL TO POST. 7. PLANS CALL FOR 2 NOTCH BEAMS. 8. SOUTH VEGA POST APPREAR TO BE BOLTED INTO HOLLOW BLOCK WALL. 9. FIREPLACE STACK 4 BELOW ROOF. |
| 05/18/1998 |
EXCAVATION/LAYOUT REBAR & ZON |
|
Denied |
DENIED |
| 06/18/1997 |
EXCAVATION/LAYOUT REBAR & ZON |
|
Denied |
|