Inspection Status: Re-inspection required
Inspection History: TRSP - ROW - Notice of Completion
| Date |
Description |
Inspector |
Results |
Comments |
| 03/06/2024 |
TRSP - ROW - Notice of Completion |
|
Re-inspection required |
striping not completed. email sent to applicant and Mike bravin. |
| 03/21/2024 |
TRSP - ROW - Notice of Completion |
|
Re-inspection required |
see past 3 inspections. sent email to Sylvia with Tucson water. |
| 08/21/2025 |
TRSP - ROW - Notice of Completion |
|
Passed |
|
| 09/22/2023 |
TRSP - ROW - Notice of Completion |
|
Re-inspection required |
cold mix needs to be removed and hot mix placed. stripping needed in south bound turn lane. seal coat needed per utility manual lane width 25’ each direction of all patched made. |