Inspection Status: Re-inspection required
Inspection History: TRSP - ROW - Final/Close-Out
| Date |
Description |
Inspector |
Results |
Comments |
| 01/30/2025 |
TRSP - ROW - Final/Close-Out |
|
Re-inspection required |
asphalt is still in the same condition since last inspection, permanent patch with 25 foot across required |
| 03/07/2025 |
TRSP - ROW - Final/Close-Out |
|
Re-inspection required |
Still needs a final pavement repair and seal coat 25 ft in both directions full width of lane. |
| 03/25/2024 |
TRSP - ROW - Final/Close-Out |
|
Re-inspection required |
|
| 09/29/2025 |
TRSP - ROW - Final/Close-Out |
|
Re-inspection required |
|
| 10/19/2023 |
TRSP - ROW - Final/Close-Out |
|
Re-inspection required |
contractor has expired permit. asphalt replacement needed and seal coat 25’ in each direction for entire roadway width per utility manual. |
| 12/17/2025 |
TRSP - ROW - Final/Close-Out |
|
Re-inspection required |
Still needs a final pavement repair and seal coat 25 ft in both directions full width of lane. |