Inspection Status: Re-inspection required
Inspection History: TRSP - ROW - Recurring
| Date |
Description |
Inspector |
Results |
Comments |
| 10/20/2022 |
TRSP - ROW - Recurring |
|
Re-inspection required |
TDOT-EXCAV GENERAL INSPECTION - Concrete form inspection, approved to pour. |
| 10/19/2022 |
TRSP - ROW - Recurring |
|
Re-inspection required |
TDOT-EXCAV GENERAL INSPECTION - Continued. Curb has been poured and approved forms are being set for sidewalk and ramp |
| 10/18/2022 |
TRSP - ROW - Recurring |
|
Re-inspection required |
TDOT-EXCAV GENERAL INSPECTION - Concrete form inspection, approved to pour. |
| 10/17/2022 |
TRSP - ROW - Recurring |
|
Re-inspection required |
TDOT-EXCAV GENERAL INSPECTION - Correction Required. curb cuts will be done today ramp curb will be removed and reformed will inspect tomorrow again |
| 10/14/2022 |
TRSP - ROW - Recurring |
|
Re-inspection required |
TDOT-EXCAV GENERAL INSPECTION - Concrete form inspection, corrections needed. Curb has been poured and rejected it is designed for a 4 foot sidewalk needs to be a minimum of 5 feet sidewalk must be formed for 5 feet also |
| 10/18/2022 |
TRSP - ROW - Recurring |
|
Re-inspection required |
TDOT-Routine Barricade Inspect - Traffic control is set according to plan. |
| 09/20/2022 |
TRSP - ROW - Recurring |
|
Re-inspection required |
TDOT-EXCAV GENERAL INSPECTION - Continued. Had a pre-con with Durazo Construction discuss new driveway apron |
| 10/17/2022 |
TRSP - ROW - Recurring |
|
Re-inspection required |
TDOT-Routine Barricade Inspect - Traffic control is set according to plan. |
| 12/20/2022 |
TRSP - ROW - Recurring |
|
Complete (Recurring) |
|
| 08/23/2023 |
TRSP - ROW - Recurring |
|
Passed |
|