Inspection History Details
Inspection Status: Re-inspection required
Inspection History: TRSP - ROW - Recurring
Permit Number - T22RW02664
Inspection Description - TRSP - ROW - Recurring
Inspection Status - Re-inspection required
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 10/19/2022 | TRSP - ROW - Recurring | Re-inspection required | TDOT-EXCAV GENERAL INSPECTION - I am adding the compaction results to this inspection. | |
| 10/10/2022 | TRSP - ROW - Recurring | Re-inspection required | TDOT-EXCAV GENERAL INSPECTION - Both wheelchair ramps are more than 2% cross slope. They both need to be fixed. I have already informed the contractor. | |
| 10/05/2022 | TRSP - ROW - Recurring | Re-inspection required | TDOT-EXCAV GENERAL INSPECTION - New curb has been poured. The wheelchair ramps are being formed up. | |
| 09/22/2022 | TRSP - ROW - Recurring | Re-inspection required | TDOT-EXCAV GENERAL INSPECTION - Sidewalk and asphalt has been removed. | |
| 10/05/2022 | TRSP - ROW - Recurring | Re-inspection required | TDOT-Routine Barricade Inspect - Traffic control is set according to plan. | |
| 09/01/2022 | TRSP - ROW - Recurring | Re-inspection required | TDOT-EXCAV GENERAL INSPECTION - No sign of any work. | |
| 09/22/2022 | TRSP - ROW - Recurring | Re-inspection required | TDOT-Routine Barricade Inspect - Traffic control is set according to plan. | |
| 08/23/2022 | TRSP - ROW - Recurring | Re-inspection required | TDOT-EXCAV GENERAL INSPECTION - Had pre-con with contractor. | |
| 09/15/2022 | TRSP - ROW - Recurring | Re-inspection required | TDOT-Routine Barricade Inspect - Traffic control is set according to plan. | |
| 08/22/2022 | TRSP - ROW - Recurring | Re-inspection required | TDOT-EXCAV GENERAL INSPECTION - No sign of any work. | |
| 09/12/2022 | TRSP - ROW - Recurring | Re-inspection required | TDOT-Routine Barricade Inspect - They are installing the barricades today. I informed them their permit was expired and they are already working on getting it renewed. | |
| 08/10/2022 | TRSP - ROW - Recurring | Re-inspection required | TDOT-EXCAV GENERAL INSPECTION - No signs of work on Cody Street. No signs of work along Speedway Boulevard. | |
| 08/23/2022 | TRSP - ROW - Recurring | Re-inspection required | TDOT-Routine Barricade Inspect - The traffic control plan will be modified a little bit. Instead of having openings in two of the driveways they are going to put the pedestrian bypass through them. They are going to make some sort of sidewalk between the curb and existing sidewalk. I suggested either cold patch or plywood through the dirt areas so wheelchairs can go through. Whatever material they use to make a makeshift sidewalk through the dirt area it has to be maintained. It also has to maintain ADA standards. | |
| 11/04/2022 | TRSP - ROW - Recurring | Complete (Recurring) |