Inspection Status: Re-inspection required
Inspection History: TRSP - ROW - Recurring
| Date |
Description |
Inspector |
Results |
Comments |
| 10/10/2022 |
TRSP - ROW - Recurring |
|
Re-inspection required |
TDOT-EXCAV GENERAL INSPECTION - Asphalt repairs still needed |
| 10/04/2022 |
TRSP - ROW - Recurring |
|
Re-inspection required |
TDOT-EXCAV GENERAL INSPECTION - Temporary asphalt patch still in roadway |
| 09/12/2022 |
TRSP - ROW - Recurring |
|
Re-inspection required |
TDOT-EXCAV GENERAL INSPECTION - Temporary asphalt patch still in roadway |
| 09/06/2022 |
TRSP - ROW - Recurring |
|
Re-inspection required |
TDOT-EXCAV GENERAL INSPECTION - Underground gas work completed. Asphalt repairs still needed. Sidewalk repairs completed. General cleanup still needed |
| 08/29/2022 |
TRSP - ROW - Recurring |
|
Re-inspection required |
TDOT-EXCAV GENERAL INSPECTION - Gas crews working on site. No issues at this time. Met with Eddie from APL to go over limits of repairs. |
| 08/29/2022 |
TRSP - ROW - Recurring |
|
Re-inspection required |
TDOT-Routine Barricade Inspect - Road closed to one lane. Flaggers being utilized. No real traffic issues at this time |
| 12/07/2022 |
TRSP - ROW - Recurring |
|
Complete (Recurring) |
|
| 01/18/2023 |
TRSP - ROW - Recurring |
|
Complete (Recurring) |
Permanent asphalt patch is in place. Microseal is still needed. |
| 02/13/2023 |
TRSP - ROW - Recurring |
|
Complete (Recurring) |
All underground work is complete. Permanent asphalt patches in place. Microseal still needed at this time. Left a message with Judi at NPL waiting for a callback. |