Inspection History Details
Inspection Status: Re-inspection required
Inspection History: TRSP - ROW - Recurring
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 09/02/2022 | TRSP - ROW - Recurring | Re-inspection required | TDOT-EXCAV GENERAL INSPECTION - Notices have been handed out | |
| 09/02/2022 | TRSP - ROW - Recurring | Re-inspection required | TDOT-EXCAV GENERAL INSPECTION - Precon held on site. 1. Notify parkways 2. Notify three homes will work will be done 3. Discussed all repairs. |
|
| 11/02/2022 | TRSP - ROW - Recurring | Passed |