Inspection Status: Re-inspection required
Inspection History: TRSP - ROW - Recurring
| Date |
Description |
Inspector |
Results |
Comments |
| 09/09/2022 |
TRSP - ROW - Recurring |
|
Re-inspection required |
TDOT-EXCAV GENERAL INSPECTION - Temporary patch in roadway, needs permanent restoration. |
| 09/01/2022 |
TRSP - ROW - Recurring |
|
Re-inspection required |
TDOT-EXCAV GENERAL INSPECTION - Permanent patch in place. Needs a Microsealing . The sidewalk on the west side of Houghton needs to be rehabilitated. The curb and walking path on the east side of Alton needs to be fixed. |
| 08/18/2022 |
TRSP - ROW - Recurring |
|
Re-inspection required |
TDOT-EXCAV GENERAL INSPECTION - Underground work complete. Temporary patch in Roadway. |
| 08/09/2022 |
TRSP - ROW - Recurring |
|
Re-inspection required |
TDOT-EXCAV GENERAL INSPECTION - Temporary patch across the roadway. The sidewalks on each side of Halton need to be rehabilitated. |
| 09/01/2022 |
TRSP - ROW - Recurring |
|
Re-inspection required |
TDOT-Routine Barricade Inspect - Traffic control is set according to plan. |
| 08/02/2022 |
TRSP - ROW - Recurring |
|
Re-inspection required |
TDOT-EXCAV GENERAL INSPECTION - I talked to Liberty and informed him the permit is expired. I told him to either renew the permit or remove the barricading. |
| 08/09/2022 |
TRSP - ROW - Recurring |
|
Re-inspection required |
TDOT-Routine Barricade Inspect - Traffic control is set according to plan. |
| 07/22/2022 |
TRSP - ROW - Recurring |
|
Re-inspection required |
TDOT-EXCAV GENERAL INSPECTION - Temporary patch across roadway. Excavation still going on in the sidewalk area on each side of Houghton. |
| 08/02/2022 |
TRSP - ROW - Recurring |
|
Re-inspection required |
TDOT-Routine Barricade Inspect - Some of the barricading has been knocked over. I talked to Liberty and informed him of this. He is going to get trafficade out here to fix it. |
| 07/15/2022 |
TRSP - ROW - Recurring |
|
Re-inspection required |
TDOT-EXCAV GENERAL INSPECTION - Work on going. |
| 07/22/2022 |
TRSP - ROW - Recurring |
|
Re-inspection required |
TDOT-Routine Barricade Inspect - Traffic control is set according to plan. |
| 07/08/2022 |
TRSP - ROW - Recurring |
|
Re-inspection required |
TDOT-EXCAV GENERAL INSPECTION - Temporary patch in Roadway. The sidewalk has been cut on both sides of Houghton. |
| 07/15/2022 |
TRSP - ROW - Recurring |
|
Re-inspection required |
TDOT-Routine Barricade Inspect - Traffic control is set according to plan. |
| 10/03/2022 |
TRSP - ROW - Recurring |
|
Re-inspection required |
TDOT-EXCAV GENERAL INSPECTION - Permanent patch in place. Needs microseal. |
| 09/21/2022 |
TRSP - ROW - Recurring |
|
Re-inspection required |
TDOT-EXCAV GENERAL INSPECTION - Temporary patch in roadway, needs permanent restoration. |
| 06/23/2022 |
TRSP - ROW - Recurring |
|
Re-inspection required |
TDOT-EXCAV GENERAL INSPECTION - No signs of any work. |
| 07/08/2022 |
TRSP - ROW - Recurring |
|
Re-inspection required |
TDOT-Routine Barricade Inspect - Traffic control is set according to plan. |
| 12/02/2022 |
TRSP - ROW - Recurring |
|
Complete (Recurring) |
|
| 08/02/2023 |
TRSP - ROW - Recurring |
|
Complete (Recurring) |
|