| 07/25/2022 |
TRSP - ROW - Recurring |
|
Re-inspection required |
TDOT-EXCAV GENERAL INSPECTION - Not Ready for Inspection. Precon. need to replace the west wing of curb will be removing existing sidewalk to replace with ada sidewalk to connect the first phase with the second phase. The street light and bollard will stay. |
| 08/25/2022 |
TRSP - ROW - Recurring |
|
Re-inspection required |
TDOT-Routine Barricade Inspect - Traffic control is set according to plan. |
| 07/11/2022 |
TRSP - ROW - Recurring |
|
Re-inspection required |
TDOT-EXCAV GENERAL INSPECTION - Not Ready for Inspection |
| 08/23/2022 |
TRSP - ROW - Recurring |
|
Re-inspection required |
TDOT-Routine Barricade Inspect - Traffic control is set according to plan. Temp pedestrian sidewalk is good. |
| 05/12/2022 |
TRSP - ROW - Recurring |
|
Passed |
TDOT-EXCAV GENERAL INSPECTION - All work complete, no concerns. Will be micro surface when next faze is complete. |
| 05/12/2022 |
TRSP - ROW - Recurring |
|
Passed |
TDOT-Routine Barricade Inspect - Traffic control devices have been removed from site. |
| 05/05/2022 |
TRSP - ROW - Recurring |
|
Re-inspection required |
TDOT-EXCAV GENERAL INSPECTION - Continued |
| 05/05/2022 |
TRSP - ROW - Recurring |
|
Re-inspection required |
TDOT-Routine Barricade Inspect - Traffic control is set according to plan. Sidewalk is now open |
| 05/03/2022 |
TRSP - ROW - Recurring |
|
Re-inspection required |
TDOT-EXCAV GENERAL INSPECTION - Continued. Will be taking out some of the asphalt to th the west of new sidewalk to make an ada accessible slope to new scupper |
| 05/03/2022 |
TRSP - ROW - Recurring |
|
Re-inspection required |
TDOT-Routine Barricade Inspect - Traffic control is set according to plan. |
| 04/29/2022 |
TRSP - ROW - Recurring |
|
Re-inspection required |
TDOT-EXCAV GENERAL INSPECTION - All work complete, no concerns. Cross slope at driveway is good. |
| 04/29/2022 |
TRSP - ROW - Recurring |
|
Re-inspection required |
TDOT-Routine Barricade Inspect - Traffic control is set according to plan. |
| 04/19/2022 |
TRSP - ROW - Recurring |
|
Re-inspection required |
TDOT-EXCAV GENERAL INSPECTION - Concrete form inspection, approved to pour. Driveway is good |
| 04/19/2022 |
TRSP - ROW - Recurring |
|
Re-inspection required |
TDOT-Routine Barricade Inspect - Traffic control needs maintenance. I let contractor know to maintain and that a temp sidewalk will need to be installed. |
| 09/27/2022 |
TRSP - ROW - Recurring |
|
Re-inspection required |
TDOT-EXCAV GENERAL INSPECTION - Continued. Driveway approved to pour concrete |
| 09/22/2022 |
TRSP - ROW - Recurring |
|
Re-inspection required |
TDOT-EXCAV GENERAL INSPECTION - Continued. Met with contractor about new sidewalk. No gradual turns in sidewalk around street light pole and bollard. Will make changes with the driveway apron. |
| 09/21/2022 |
TRSP - ROW - Recurring |
|
Re-inspection required |
TDOT-EXCAV GENERAL INSPECTION - Continued. Cross slopes are good. |
| 04/11/2022 |
TRSP - ROW - Recurring |
|
Re-inspection required |
TDOT-EXCAV GENERAL INSPECTION - Concrete form inspection, approved to pour. Will pour back gutter to original elevation than match asphalt to existing when they pave parking lot. |
| 04/11/2022 |
TRSP - ROW - Recurring |
|
Re-inspection required |
TDOT-Routine Barricade Inspect - Traffic control is set according to plan. |
| 09/15/2022 |
TRSP - ROW - Recurring |
|
Re-inspection required |
TDOT-EXCAV GENERAL INSPECTION - Concrete form inspection, approved to pour. |
| 09/27/2022 |
TRSP - ROW - Recurring |
|
Re-inspection required |
TDOT-Routine Barricade Inspect - Traffic control is set according to plan. |
| 09/14/2022 |
TRSP - ROW - Recurring |
|
Re-inspection required |
TDOT-EXCAV GENERAL INSPECTION - Sidewalk forms have been moved finishing up this morning hope to pour tomorrow. Construction also going on at this time. |
| 09/22/2022 |
TRSP - ROW - Recurring |
|
Re-inspection required |
TDOT-Routine Barricade Inspect - Traffic control is set according to plan. |
| 09/13/2022 |
TRSP - ROW - Recurring |
|
Re-inspection required |
TDOT-EXCAV GENERAL INSPECTION - Sidewalk forms will be moved back 4 to 6 inches to clear the light pole collar. Reform will happen on Wednesday I will come back to inspect when completed. |
| 09/21/2022 |
TRSP - ROW - Recurring |
|
Re-inspection required |
TDOT-Routine Barricade Inspect - Traffic control is set according to plan. |
| 09/12/2022 |
TRSP - ROW - Recurring |
|
Re-inspection required |
TDOT-EXCAV GENERAL INSPECTION - Construction is in progress at this time. |
| 09/15/2022 |
TRSP - ROW - Recurring |
|
Re-inspection required |
TDOT-Routine Barricade Inspect - Traffic control is set according to plan. |
| 09/01/2022 |
TRSP - ROW - Recurring |
|
Re-inspection required |
TDOT-EXCAV GENERAL INSPECTION - Continued |
| 09/14/2022 |
TRSP - ROW - Recurring |
|
Re-inspection required |
TDOT-Routine Barricade Inspect - Traffic control is set according to plan. |
| 08/25/2022 |
TRSP - ROW - Recurring |
|
Re-inspection required |
TDOT-EXCAV GENERAL INSPECTION - Continued |
| 09/13/2022 |
TRSP - ROW - Recurring |
|
Re-inspection required |
TDOT-Routine Barricade Inspect - Traffic control is set according to plan. |
| 08/18/2022 |
TRSP - ROW - Recurring |
|
Re-inspection required |
TDOT-EXCAV GENERAL INSPECTION - Not Ready for Inspection |
| 09/12/2022 |
TRSP - ROW - Recurring |
|
Re-inspection required |
TDOT-Routine Barricade Inspect - Traffic control is set according to plan. |
| 08/11/2022 |
TRSP - ROW - Recurring |
|
Re-inspection required |
TDOT-EXCAV GENERAL INSPECTION - Not Ready for Inspection |
| 09/06/2022 |
TRSP - ROW - Recurring |
|
Re-inspection required |
TDOT-Routine Barricade Inspect - Traffic control is set according to plan. |
| 08/05/2022 |
TRSP - ROW - Recurring |
|
Re-inspection required |
TDOT-EXCAV GENERAL INSPECTION - Not Ready for Inspection |
| 09/01/2022 |
TRSP - ROW - Recurring |
|
Re-inspection required |
TDOT-Routine Barricade Inspect - Traffic control is set according to plan. |
| 08/03/2022 |
TRSP - ROW - Recurring |
|
Re-inspection required |
TDOT-EXCAV GENERAL INSPECTION - Not Ready for Inspection. Precon. For driveway entrance. |
| 08/29/2022 |
TRSP - ROW - Recurring |
|
Re-inspection required |
TDOT-Routine Barricade Inspect - Traffic control is set according to plan. |
| 03/22/2022 |
TRSP - ROW - Recurring |
|
Re-inspection required |
TDOT-EXCAV GENERAL INSPECTION - Continued. Will be installing new curb for new driveway. New 6 foot sidewalk and 2 new scuppers. Will need to micro surface bus lane. I am going to let them wait until phase 3 is complete to micro surface phase 2 and 3 at the same time. They are going to start phase 3 as soon as this is complete. |
| 03/22/2022 |
TRSP - ROW - Recurring |
|
Re-inspection required |
TDOT-Routine Barricade Inspect - Correction Required. Traffic control has a bus lane and a right lane closure. The right lane closure will be taken down until approved plan submitted. It will be used when needed. |
| 11/16/2022 |
TRSP - ROW - Recurring |
|
Complete (Recurring) |
|
| 05/19/2023 |
TRSP - ROW - Recurring |
|
Passed |
|