Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you cannot find what you are looking for please submit a records request.

Permit: T22RW00724

Parcel: 131010400


Addresses:

4984 E 22ND ST

Inspection Status: Re-inspection required

Inspection History: TRSP - ROW - Recurring

Date Description Inspector Results Comments
07/25/2022 TRSP - ROW - Recurring Re-inspection required TDOT-EXCAV GENERAL INSPECTION - Not Ready for Inspection. Precon. need to replace the west wing of curb will be removing existing sidewalk to replace with ada sidewalk to connect the first phase with the second phase. The street light and bollard will stay.
08/25/2022 TRSP - ROW - Recurring Re-inspection required TDOT-Routine Barricade Inspect - Traffic control is set according to plan.
07/11/2022 TRSP - ROW - Recurring Re-inspection required TDOT-EXCAV GENERAL INSPECTION - Not Ready for Inspection
08/23/2022 TRSP - ROW - Recurring Re-inspection required TDOT-Routine Barricade Inspect - Traffic control is set according to plan. Temp pedestrian sidewalk is good.
05/12/2022 TRSP - ROW - Recurring Passed TDOT-EXCAV GENERAL INSPECTION - All work complete, no concerns. Will be micro surface when next faze is complete.
05/12/2022 TRSP - ROW - Recurring Passed TDOT-Routine Barricade Inspect - Traffic control devices have been removed from site.
05/05/2022 TRSP - ROW - Recurring Re-inspection required TDOT-EXCAV GENERAL INSPECTION - Continued
05/05/2022 TRSP - ROW - Recurring Re-inspection required TDOT-Routine Barricade Inspect - Traffic control is set according to plan. Sidewalk is now open
05/03/2022 TRSP - ROW - Recurring Re-inspection required TDOT-EXCAV GENERAL INSPECTION - Continued. Will be taking out some of the asphalt to th the west of new sidewalk to make an ada accessible slope to new scupper
05/03/2022 TRSP - ROW - Recurring Re-inspection required TDOT-Routine Barricade Inspect - Traffic control is set according to plan.
04/29/2022 TRSP - ROW - Recurring Re-inspection required TDOT-EXCAV GENERAL INSPECTION - All work complete, no concerns. Cross slope at driveway is good.
04/29/2022 TRSP - ROW - Recurring Re-inspection required TDOT-Routine Barricade Inspect - Traffic control is set according to plan.
04/19/2022 TRSP - ROW - Recurring Re-inspection required TDOT-EXCAV GENERAL INSPECTION - Concrete form inspection, approved to pour. Driveway is good
04/19/2022 TRSP - ROW - Recurring Re-inspection required TDOT-Routine Barricade Inspect - Traffic control needs maintenance. I let contractor know to maintain and that a temp sidewalk will need to be installed.
09/27/2022 TRSP - ROW - Recurring Re-inspection required TDOT-EXCAV GENERAL INSPECTION - Continued. Driveway approved to pour concrete
09/22/2022 TRSP - ROW - Recurring Re-inspection required TDOT-EXCAV GENERAL INSPECTION - Continued. Met with contractor about new sidewalk. No gradual turns in sidewalk around street light pole and bollard. Will make changes with the driveway apron.
09/21/2022 TRSP - ROW - Recurring Re-inspection required TDOT-EXCAV GENERAL INSPECTION - Continued. Cross slopes are good.
04/11/2022 TRSP - ROW - Recurring Re-inspection required TDOT-EXCAV GENERAL INSPECTION - Concrete form inspection, approved to pour. Will pour back gutter to original elevation than match asphalt to existing when they pave parking lot.
04/11/2022 TRSP - ROW - Recurring Re-inspection required TDOT-Routine Barricade Inspect - Traffic control is set according to plan.
09/15/2022 TRSP - ROW - Recurring Re-inspection required TDOT-EXCAV GENERAL INSPECTION - Concrete form inspection, approved to pour.
09/27/2022 TRSP - ROW - Recurring Re-inspection required TDOT-Routine Barricade Inspect - Traffic control is set according to plan.
09/14/2022 TRSP - ROW - Recurring Re-inspection required TDOT-EXCAV GENERAL INSPECTION - Sidewalk forms have been moved finishing up this morning hope to pour tomorrow. Construction also going on at this time.
09/22/2022 TRSP - ROW - Recurring Re-inspection required TDOT-Routine Barricade Inspect - Traffic control is set according to plan.
09/13/2022 TRSP - ROW - Recurring Re-inspection required TDOT-EXCAV GENERAL INSPECTION - Sidewalk forms will be moved back 4 to 6 inches to clear the light pole collar. Reform will happen on Wednesday I will come back to inspect when completed.
09/21/2022 TRSP - ROW - Recurring Re-inspection required TDOT-Routine Barricade Inspect - Traffic control is set according to plan.
09/12/2022 TRSP - ROW - Recurring Re-inspection required TDOT-EXCAV GENERAL INSPECTION - Construction is in progress at this time.
09/15/2022 TRSP - ROW - Recurring Re-inspection required TDOT-Routine Barricade Inspect - Traffic control is set according to plan.
09/01/2022 TRSP - ROW - Recurring Re-inspection required TDOT-EXCAV GENERAL INSPECTION - Continued
09/14/2022 TRSP - ROW - Recurring Re-inspection required TDOT-Routine Barricade Inspect - Traffic control is set according to plan.
08/25/2022 TRSP - ROW - Recurring Re-inspection required TDOT-EXCAV GENERAL INSPECTION - Continued
09/13/2022 TRSP - ROW - Recurring Re-inspection required TDOT-Routine Barricade Inspect - Traffic control is set according to plan.
08/18/2022 TRSP - ROW - Recurring Re-inspection required TDOT-EXCAV GENERAL INSPECTION - Not Ready for Inspection
09/12/2022 TRSP - ROW - Recurring Re-inspection required TDOT-Routine Barricade Inspect - Traffic control is set according to plan.
08/11/2022 TRSP - ROW - Recurring Re-inspection required TDOT-EXCAV GENERAL INSPECTION - Not Ready for Inspection
09/06/2022 TRSP - ROW - Recurring Re-inspection required TDOT-Routine Barricade Inspect - Traffic control is set according to plan.
08/05/2022 TRSP - ROW - Recurring Re-inspection required TDOT-EXCAV GENERAL INSPECTION - Not Ready for Inspection
09/01/2022 TRSP - ROW - Recurring Re-inspection required TDOT-Routine Barricade Inspect - Traffic control is set according to plan.
08/03/2022 TRSP - ROW - Recurring Re-inspection required TDOT-EXCAV GENERAL INSPECTION - Not Ready for Inspection. Precon. For driveway entrance.
08/29/2022 TRSP - ROW - Recurring Re-inspection required TDOT-Routine Barricade Inspect - Traffic control is set according to plan.
03/22/2022 TRSP - ROW - Recurring Re-inspection required TDOT-EXCAV GENERAL INSPECTION - Continued. Will be installing new curb for new driveway. New 6 foot sidewalk and 2 new scuppers. Will need to micro surface bus lane. I am going to let them wait until phase 3 is complete to micro surface phase 2 and 3 at the same time. They are going to start phase 3 as soon as this is complete.
03/22/2022 TRSP - ROW - Recurring Re-inspection required TDOT-Routine Barricade Inspect - Correction Required. Traffic control has a bus lane and a right lane closure. The right lane closure will be taken down until approved plan submitted. It will be used when needed.
11/16/2022 TRSP - ROW - Recurring Complete (Recurring)
05/19/2023 TRSP - ROW - Recurring Passed