Inspection Status: Passed
Inspection History: TRSP - ROW - Recurring
Permit Number - T22RW00477
Inspection Description - TRSP - ROW - Recurring
Inspection Status - Passed
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
08/25/2022 | TRSP - ROW - Recurring | Passed | TDOT-Routine Barricade Inspect - Traffic control devices have been removed from site. | |
05/20/2022 | TRSP - ROW - Recurring | Re-inspection required | TDOT-Routine Barricade Inspect - Traffic control is set according to plan. | |
08/25/2022 | TRSP - ROW - Recurring | Passed | TDOT-EXCAV GENERAL INSPECTION - Asphalt restored slurry completed. Landscaping restored. Site passes final ROW inspection | |
05/20/2022 | TRSP - ROW - Recurring | Re-inspection required | TDOT-EXCAV GENERAL INSPECTION - Saguaro seal cot sealed one side of roadway and is going to complete other half. Patches completed by Northstar. | |
05/20/2022 | TRSP - ROW - Recurring | Re-inspection required | TDOT-Routine Barricade Inspect - Traffic control is set according to plan. | |
03/29/2022 | TRSP - ROW - Recurring | Re-inspection required | TDOT-Routine Barricade Inspect - Talked with foreman on site Hector and his supervisor Justin and informed them of complaints about early set ups. Permit says 7 to 4. I asked the contractor not to set up prior to traffic restrictions from 7 to 9. Forbes Road can be set up at seven but too much traffic on Grant for early set up. I informed him that just cause the permit says it doesn’t mean it’s always right. I informed my supervisor Dan Robertson and the inspector Travis. | |
05/20/2022 | TRSP - ROW - Recurring | Re-inspection required | TDOT-EXCAV GENERAL INSPECTION - Northstar patching asphalt. Saguaro seal cot onsite to seal coat roadway. | |
03/29/2022 | TRSP - ROW - Recurring | Re-inspection required | TDOT-EXCAV GENERAL INSPECTION - Northstar pot holing. Multiple unknown fibers 881 notified trying to find who’s services. Citizens called complain on traffic control. Plans approved have set up 0700-1600 including grant. City notified contractor and trafficade that grant has a 0900-1530 set up time Forbes can be 0700-1600. | |
03/29/2022 | TRSP - ROW - Recurring | Re-inspection required | TDOT-Routine Barricade Inspect - Continued | |
03/28/2022 | TRSP - ROW - Recurring | Re-inspection required | TDOT-EXCAV GENERAL INSPECTION - Northstar starting bore for power. Boring in front of QT head quarters south east to swf site tomorrow will bore north to connection area. | |
03/28/2022 | TRSP - ROW - Recurring | Re-inspection required | TDOT-Routine Barricade Inspect - Traffic control is set according to plan. | |
03/25/2022 | TRSP - ROW - Recurring | Re-inspection required | TDOT-EXCAV GENERAL INSPECTION - Northstar pot holing finished. Backfilled with AB and cold Patch placed on top. Will be here Monday at 0830 to begin bore shots of roughly 700’. |
|
03/25/2022 | TRSP - ROW - Recurring | Re-inspection required | TDOT-Routine Barricade Inspect - Traffic control is set according to plan. |