Inspection Status: Re-inspection required
Inspection History: TRSP - ROW - Recurring
| Date |
Description |
Inspector |
Results |
Comments |
| 10/17/2022 |
TRSP - ROW - Recurring |
|
Re-inspection required |
TDOT-EXCAV GENERAL INSPECTION - Temporary patch in roadway, needs permanent restoration. |
| 08/29/2022 |
TRSP - ROW - Recurring |
|
Re-inspection required |
TDOT-EXCAV GENERAL INSPECTION - Continued. Permanent patch has been sick waiting for microsurface of area |
| 07/28/2022 |
TRSP - ROW - Recurring |
|
Re-inspection required |
TDOT-EXCAV GENERAL INSPECTION - Continued. Closure has been opened up for traffic |
| 07/12/2022 |
TRSP - ROW - Recurring |
|
Re-inspection required |
TDOT-EXCAV GENERAL INSPECTION - Continued. Conquering casing for manholes valve cover lids are being set |
| 10/17/2022 |
TRSP - ROW - Recurring |
|
Re-inspection required |
TDOT-Routine Barricade Inspect - Traffic control devices have been removed from site. |
| 07/05/2022 |
TRSP - ROW - Recurring |
|
Re-inspection required |
TDOT-EXCAV GENERAL INSPECTION - Continued. Permanent patchis been sad I’m waiting Microseal |
| 07/12/2022 |
TRSP - ROW - Recurring |
|
Re-inspection required |
TDOT-Routine Barricade Inspect - Traffic control is set according to plan. |
| 06/23/2022 |
TRSP - ROW - Recurring |
|
Re-inspection required |
TDOT-EXCAV GENERAL INSPECTION - Continued. Durazo Construction is preparing for Paving once Paving is complete the micro surface will be added |
| 07/05/2022 |
TRSP - ROW - Recurring |
|
Re-inspection required |
TDOT-Routine Barricade Inspect - Traffic control is set according to plan. Durazo Construction wants to use Rusel Avenue as a construction entrance I asked if they talk to downtown for Permission |
| 06/02/2022 |
TRSP - ROW - Recurring |
|
Re-inspection required |
TDOT-EXCAV GENERAL INSPECTION - Temporary patch in roadway, needs permanent restoration. Heart closure isn’t placed trenching is being performed at this time |
| 06/23/2022 |
TRSP - ROW - Recurring |
|
Re-inspection required |
TDOT-Routine Barricade Inspect - Traffic control is set according to plan. |
| 03/02/2022 |
TRSP - ROW - Recurring |
|
Re-inspection required |
TDOT-EXCAV GENERAL INSPECTION - Continued. Excavation is being performed road is closed off for all traffic |
| 06/02/2022 |
TRSP - ROW - Recurring |
|
Re-inspection required |
TDOT-Routine Barricade Inspect - Traffic control is set according to plan. 24 hour Congress set up |
| 02/08/2022 |
TRSP - ROW - Recurring |
|
Re-inspection required |
TDOT-EXCAV GENERAL INSPECTION - Continued. I had a pre-con with Durazo Construction Dan and Mike we discussed Russel and 18th St. the Construction they are replacing waterline waterline discussed utility manual T- top specs and microsurface |
| 03/02/2022 |
TRSP - ROW - Recurring |
|
Re-inspection required |
TDOT-Routine Barricade Inspect - Traffic control is set according to plan. |
| 11/29/2022 |
TRSP - ROW - Recurring |
|
Passed |
|