Permit: T22RW00371

Parcel: 11707207A


Addresses:

18 W 18TH ST


Inspection Status: Re-inspection required

Inspection History: TRSP - ROW - Recurring

Permit Number - T22RW00371

Inspection Description - TRSP - ROW - Recurring

Inspection Status - Re-inspection required

Date Description Inspector Results Comments
10/17/2022 TRSP - ROW - Recurring Re-inspection required TDOT-EXCAV GENERAL INSPECTION - Temporary patch in roadway, needs permanent restoration.
08/29/2022 TRSP - ROW - Recurring Re-inspection required TDOT-EXCAV GENERAL INSPECTION - Continued. Permanent patch has been sick waiting for microsurface of area
07/28/2022 TRSP - ROW - Recurring Re-inspection required TDOT-EXCAV GENERAL INSPECTION - Continued. Closure has been opened up for traffic
07/12/2022 TRSP - ROW - Recurring Re-inspection required TDOT-EXCAV GENERAL INSPECTION - Continued. Conquering casing for manholes valve cover lids are being set
10/17/2022 TRSP - ROW - Recurring Re-inspection required TDOT-Routine Barricade Inspect - Traffic control devices have been removed from site.
07/05/2022 TRSP - ROW - Recurring Re-inspection required TDOT-EXCAV GENERAL INSPECTION - Continued. Permanent patchis been sad I’m waiting Microseal
07/12/2022 TRSP - ROW - Recurring Re-inspection required TDOT-Routine Barricade Inspect - Traffic control is set according to plan.
06/23/2022 TRSP - ROW - Recurring Re-inspection required TDOT-EXCAV GENERAL INSPECTION - Continued. Durazo Construction is preparing for Paving once Paving is complete the micro surface will be added
07/05/2022 TRSP - ROW - Recurring Re-inspection required TDOT-Routine Barricade Inspect - Traffic control is set according to plan. Durazo Construction wants to use Rusel Avenue as a construction entrance I asked if they talk to downtown for Permission
06/02/2022 TRSP - ROW - Recurring Re-inspection required TDOT-EXCAV GENERAL INSPECTION - Temporary patch in roadway, needs permanent restoration. Heart closure isn’t placed trenching is being performed at this time
06/23/2022 TRSP - ROW - Recurring Re-inspection required TDOT-Routine Barricade Inspect - Traffic control is set according to plan.
03/02/2022 TRSP - ROW - Recurring Re-inspection required TDOT-EXCAV GENERAL INSPECTION - Continued. Excavation is being performed road is closed off for all traffic
06/02/2022 TRSP - ROW - Recurring Re-inspection required TDOT-Routine Barricade Inspect - Traffic control is set according to plan. 24 hour Congress set up
02/08/2022 TRSP - ROW - Recurring Re-inspection required TDOT-EXCAV GENERAL INSPECTION - Continued. I had a pre-con with Durazo Construction Dan and Mike we discussed Russel and 18th St. the Construction they are replacing waterline waterline discussed utility manual T- top specs and microsurface
03/02/2022 TRSP - ROW - Recurring Re-inspection required TDOT-Routine Barricade Inspect - Traffic control is set according to plan.
11/29/2022 TRSP - ROW - Recurring Passed