Inspection Status: Re-inspection required
Inspection History: TRSP - ROW - Recurring
| Date |
Description |
Inspector |
Results |
Comments |
| 07/27/2022 |
TRSP - ROW - Recurring |
|
Re-inspection required |
TDOT-EXCAV GENERAL INSPECTION - Continued. Crew is on site excavating center of road to make connection to water. |
| 08/09/2022 |
TRSP - ROW - Recurring |
|
Re-inspection required |
TDOT-Routine Barricade Inspect - Traffic control is set according to plan. |
| 07/26/2022 |
TRSP - ROW - Recurring |
|
Re-inspection required |
TDOT-EXCAV GENERAL INSPECTION - Continued. Days Excavation ran into a minor setback a small portion of the trench caved in which is all sand so they are requesting to keep traffic control for 24 hours based on the emergency |
| 07/27/2022 |
TRSP - ROW - Recurring |
|
Re-inspection required |
TDOT-Routine Barricade Inspect - Traffic control is set according to plan. |
| 07/26/2022 |
TRSP - ROW - Recurring |
|
Re-inspection required |
TDOT-EXCAV GENERAL INSPECTION - Continued. Trenching across Park Avenue is still ongoing |
| 07/26/2022 |
TRSP - ROW - Recurring |
|
Re-inspection required |
TDOT-Routine Barricade Inspect - Traffic control is set according to plan. |
| 07/25/2022 |
TRSP - ROW - Recurring |
|
Re-inspection required |
TDOT-EXCAV GENERAL INSPECTION - Continued. Work being performed |
| 07/26/2022 |
TRSP - ROW - Recurring |
|
Re-inspection required |
TDOT-Routine Barricade Inspect - Traffic control is set according to plan. |
| 07/20/2022 |
TRSP - ROW - Recurring |
|
Re-inspection required |
TDOT-EXCAV GENERAL INSPECTION - Temporary patch in roadway, needs permanent restoration. Days Construction is making the connections to the new water service that will be added to the complex east of Park Avenue. We spoke that Park Avenue may be under moratorium and they may require 1 million overlay and 37th St. will need a microsurface up to park |
| 07/25/2022 |
TRSP - ROW - Recurring |
|
Re-inspection required |
TDOT-Routine Barricade Inspect - Traffic control is set according to plan. |
| 06/28/2022 |
TRSP - ROW - Recurring |
|
Re-inspection required |
TDOT-EXCAV GENERAL INSPECTION - Continued. Left a voicemail with Bonnie Days Construction awaiting response |
| 07/20/2022 |
TRSP - ROW - Recurring |
|
Re-inspection required |
TDOT-Routine Barricade Inspect - Traffic control is set according to plan. |
| 05/31/2022 |
TRSP - ROW - Recurring |
|
Re-inspection required |
TDOT-EXCAV GENERAL INSPECTION - Correction Required. Steel plates are set at 37th and park left a voicemail for Rodney days waiting response |
| 06/28/2022 |
TRSP - ROW - Recurring |
|
Re-inspection required |
TDOT-Routine Barricade Inspect - Correction Required. Permit does not allow for 24 hour closure or we can set up traffic control has been set up for weeks on a complete closure |
| 04/15/2022 |
TRSP - ROW - Recurring |
|
Re-inspection required |
TDOT-EXCAV GENERAL INSPECTION - Temporary patch in roadway, needs permanent restoration. Trenching across park has not been completed some potholes in area |
| 05/31/2022 |
TRSP - ROW - Recurring |
|
Re-inspection required |
TDOT-Routine Barricade Inspect - Traffic control needs maintenance. Traffic control I set up doing a heart closure on 37th and park permit does not allow for 24 hour or weekend left a voicemail with Rodney Days awaiting response |
| 10/06/2022 |
TRSP - ROW - Recurring |
|
Re-inspection required |
TDOT-EXCAV GENERAL INSPECTION - Continued. Permanent patch has been set waiting for seal coat |
| 08/26/2022 |
TRSP - ROW - Recurring |
|
Re-inspection required |
TDOT-EXCAV GENERAL INSPECTION - Continued. Permanent patch has been set waiting for MicroSurface |
| 10/06/2022 |
TRSP - ROW - Recurring |
|
Re-inspection required |
TDOT-Routine Barricade Inspect - Traffic control devices have been removed from site. |
| 08/11/2022 |
TRSP - ROW - Recurring |
|
Re-inspection required |
TDOT-EXCAV GENERAL INSPECTION - Continued. Met with Days Excavation Monday is the plan to repave park and 37th and a month later microsurface area |
| 08/26/2022 |
TRSP - ROW - Recurring |
|
Re-inspection required |
TDOT-Routine Barricade Inspect - Traffic control devices have been removed from site. |
| 08/10/2022 |
TRSP - ROW - Recurring |
|
Re-inspection required |
TDOT-EXCAV GENERAL INSPECTION - Continued. Traffic control and set up no work being performed |
| 08/11/2022 |
TRSP - ROW - Recurring |
|
Re-inspection required |
TDOT-Routine Barricade Inspect - Traffic control is set according to plan. |
| 08/09/2022 |
TRSP - ROW - Recurring |
|
Re-inspection required |
TDOT-EXCAV GENERAL INSPECTION - Continued. Work is ongoing pipe has been placed in trench pressure test has been completed they are making the final connections and the backfilling process will begin this week |
| 08/10/2022 |
TRSP - ROW - Recurring |
|
Re-inspection required |
TDOT-Routine Barricade Inspect - Continued. Traffic control set up with no work on site made contact with Trafficade if no one will be on site they will move traffic control |
| 02/25/2022 |
TRSP - ROW - Recurring |
|
Re-inspection required |
TDOT-EXCAV GENERAL INSPECTION - Continued. Days excavating is Saw cutting Road they’re only going to pothole the west side of Park and 37th St. no issues or concerns traffic control is not according to plan |
| 02/25/2022 |
TRSP - ROW - Recurring |
|
Re-inspection required |
TDOT-Routine Barricade Inspect - Traffic control is set according to plan. |
| 12/15/2022 |
TRSP - ROW - Recurring |
|
Passed |
|
| 11/01/2022 |
TRSP - ROW - Recurring |
|
Complete (Recurring) |
|