Inspection Status: Re-inspection required
Inspection History: TRSP - ROW - Recurring
| Date |
Description |
Inspector |
Results |
Comments |
| 08/30/2022 |
TRSP - ROW - Recurring |
|
Re-inspection required |
TDOT-EXCAV GENERAL INSPECTION - Walk through and punch list has been generated. |
| 04/13/2022 |
TRSP - ROW - Recurring |
|
Re-inspection required |
TDOT-EXCAV GENERAL INSPECTION - Concrete work in progress. Compaction test was taken and cylinders were taken as well. |
| 04/11/2022 |
TRSP - ROW - Recurring |
|
Re-inspection required |
TDOT-EXCAV GENERAL INSPECTION - All removals have been completed. Not ready for forms or compaction test |
| 02/10/2022 |
TRSP - ROW - Recurring |
|
Re-inspection required |
TDOT-EXCAV GENERAL INSPECTION - Precon held for sidewalk construction. Will change aprons to concrete. Engineer will send appropriate paperwork |
| 12/06/2022 |
TRSP - ROW - Recurring |
|
Passed |
|