Inspection History Details
Inspection Status: Passed
Inspection History: TRSP - ROW - Recurring
Permit Number - T22RW00181
Inspection Description - TRSP - ROW - Recurring
Inspection Status - Passed
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 05/24/2022 | TRSP - ROW - Recurring | Passed | TDOT-EXCAV GENERAL INSPECTION - Landscaping and sidewalk restored. Meter placed. Site passes final ROW inspection. | |
| 04/05/2022 | TRSP - ROW - Recurring | Re-inspection required | TDOT-EXCAV GENERAL INSPECTION - True net backfilling and processing material. Visual inspection of compaction passes. Restoring sidewalk panel. | |
| 05/24/2022 | TRSP - ROW - Recurring | Passed | TDOT-Routine Barricade Inspect - Traffic control devices have been removed from site. | |
| 03/18/2022 | TRSP - ROW - Recurring | Re-inspection required | TDOT-EXCAV GENERAL INSPECTION - Vertical one placing concrete for sidewalk restoration. Awaiting TEP for electrical conduit inspection. | |
| 04/05/2022 | TRSP - ROW - Recurring | Re-inspection required | TDOT-Routine Barricade Inspect - Traffic control is set according to plan. | |
| 03/17/2022 | TRSP - ROW - Recurring | Re-inspection required | TDOT-EXCAV GENERAL INSPECTION - Vertical one field crew asked to work past 1530. Request he been denied due to arterial roadway and permitted times. We were in agreement at precon that panel would be removed and pipe placed then ramp or plate placed to open sidewalk up. Side walk has been closed since 0915. Slurry expected at 1430 and either ramp or plate placed. Sidewalk restoration tomorrow 3/18 | |
| 03/18/2022 | TRSP - ROW - Recurring | Re-inspection required | TDOT-Routine Barricade Inspect - Traffic control is set according to plan. | |
| 03/17/2022 | TRSP - ROW - Recurring | Re-inspection required | TDOT-EXCAV GENERAL INSPECTION - Vertical placed riser and conduit. Placing box and slurry backfill. | |
| 03/17/2022 | TRSP - ROW - Recurring | Re-inspection required | TDOT-Routine Barricade Inspect - Traffic control is set according to plan. | |
| 03/17/2022 | TRSP - ROW - Recurring | Re-inspection required | TDOT-EXCAV GENERAL INSPECTION - Vertical one placing fiber box and running conduit. | |
| 03/17/2022 | TRSP - ROW - Recurring | Re-inspection required | TDOT-Routine Barricade Inspect - Traffic control is set according to plan. | |
| 03/10/2022 | TRSP - ROW - Recurring | Re-inspection required | TDOT-EXCAV GENERAL INSPECTION - Pre con with vertical one deih truenet and southwest barricades. Southwest barricades to be added to plans and update traffic control. Need to include sidewalk closed. Truenet will apply for TNE to bot over night due to pedestrian accessability. | |
| 03/17/2022 | TRSP - ROW - Recurring | Re-inspection required | TDOT-Routine Barricade Inspect - Traffic control is set according to plan. |