Permit: T22OT00425

Parcel: 12402002B


Addresses:

1818 E SPEEDWAY BL


Inspection Status: Not Ready

Inspection History: COT - ENGR - Signage Final

Permit Number - T22OT00425

Inspection Description - COT - ENGR - Signage Final

Inspection Status - Not Ready

Date Description Inspector Results Comments
10/27/2022 COT - ENGR - Signage Final Not Ready
09/01/2022 COT - ENGR - Signage Final bwiese1 Approved Entered by BWIESE1 - This permit T22OT00425 Will be ready to be paid for in 24 hours. WAIT 24 HOURS from receipt of this email to make the payment. USE THE NEW ONLINE PAYMENT PORTAL. Once payment is made, print your receipt, then WAIT 24 HOURS again, then reply to this email, Let us know your payment has been made.
08/31/2022 COT - ENGR - Signage Final Hthrall Partial Approval Entered by HTHRALL1 - H. Thrall / B. Wiese reviewed revision 08/31/22. Partial approval of plan set. Note - both low-profile signs were removed during the course of construction and no new plans have been filed for their replacement along Campbell or Speedway street frontages. The following review comments were emailed to the contractor: 1 ) All wall signs (A C D E F) This is new building, all the wall materials are called out on the Builders plan. Specify exactly what type of anchors will be used to secure the wall signs to the building walls. 2 ) Wall signs (D+F) add "power disconnect switch" show location with an arrow 3 ) All Directional signs (G H I J) add "power disconnect switch" show location with an arrow Show the footings 4 ) Menu Sign K - add the following 3 items to the drawing.. "No welding will be done onsite" "As per the City of Tucson Outdoor Lighting Code the Internally illuminated sign As shown on this page does not Exceed the 4400k color temp." "As per the City of Tucson Outdoor Lighting Code the Electronic Message Center As shown on this page automatically Dims to 200 NITS or less from Sunset to sunrise."
08/31/2022 COT - ENGR - Signage Final Hthrall Continued Entered by HTHRALL1 - 08/30/22 - Revised plan set received for Taco Bell signage from Fluoresco. Plans under review.
08/02/2022 COT - ENGR - Signage Final Hthrall Denied Entered by HTHRALL1 - Heather forwarded the marked plan set from Brian dated 6/9/22 to Emily Arredondo's email again. The marked set shows the information missing / what's needed for a review to be done.
06/09/2022 COT - ENGR - Signage Final Hthrall Denied Entered by HTHRALL1 - Brian Wiese received an email 6/9/22 from Fluoresco with the submitted plan set. He marked the plans with the information needed still to conduct a review and also inquired about the monument sign absent from the package. He emailed the marked plan set to Emily Arredondo for her review.
03/16/2023 COT - ENGR - Signage Final Re-inspection required Contractor called me this morning and would like this inspection to be rescheduled for Monday morning