Inspection Status: Not Ready
Inspection History: FCON – OH Piping & Hydro
| Date |
Description |
Inspector |
Results |
Comments |
| 10/26/2022 |
FCON – OH Piping & Hydro |
|
Not Ready |
|
| 10/20/2022 |
FCON – OH Piping & Hydro |
CGates |
Partial Approval |
Entered by CGATES1 - 1st floor 210 psi, 1st floor only approved. |
| 09/07/2022 |
FCON – OH Piping & Hydro |
pls |
Prior to Final Inspectn |
Entered by PSHELTO1 - INCLUDES FIVE (5) INSPECTIONS |
| 11/22/2022 |
FCON – OH Piping & Hydro |
|
Partial Pass |
2nd floor approved, 3rd floor 1 BR west/north hallway head to close to the wall, 1 BR east/south closet head to close to wall. |
| 12/01/2022 |
FCON – OH Piping & Hydro |
|
Passed |
Corrections on the 3rd floor of building 2 have been made. |