Inspection Status: Not Ready
Inspection History: COT - FCON - Alarm - Final
| Date |
Description |
Inspector |
Results |
Comments |
| 10/26/2022 |
COT - FCON - Alarm - Final |
|
Not Ready |
|
| 08/16/2022 |
COT - FCON - Alarm - Final |
CGates |
Partial Approval |
Entered by CGATES1 - A device needs to be added to the AV Room, All strobes need to be synchronized, Lock out for breaker, document box and As Built drawings submitted. |
| 01/31/2023 |
COT - FCON - Alarm - Final |
|
Passed |
|