Inspection History Details
Inspection Status: Approved
Inspection History: FIRE SPKLR - UG PIPING FLUSH
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 07/20/2022 | FIRE SPKLR - UG PIPING FLUSH | Approved | P2F Test certificate | |
| 07/19/2022 | FIRE SPKLR - UG PIPING FLUSH | Denied | Check valve from FDC installed backwards |