Inspection Status: Approved
Inspection History: FIRE SPKLR - UG, PIPING, HYDRO
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 02/03/2022 | FIRE SPKLR - UG, PIPING, HYDRO | Approved | ||
| 01/31/2022 | FIRE SPKLR - UG, PIPING, HYDRO | Denied | Visual inspection done, ok to back fill and cover the pipe. Hydro not complete. Another leak was found under the riser. |
|
| 01/28/2022 | FIRE SPKLR - UG, PIPING, HYDRO | Cancelled | Nedded to cap UG at main for hydro test | |
| 01/18/2022 | FIRE SPKLR - UG, PIPING, HYDRO | Denied | When the street valve was oppened to pressurize the system another leak was discovered in the supply under the asphalt. It is recomemded that the entire underground supply line be replaced. |