Inspection History Details
Inspection Status: Approved
Inspection History: INSP - INITIAL CODE ENFORCMENT
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 10/10/2022 | INSP - INITIAL CODE ENFORCMENT | Approved | VISITE SITE, MET WITH TFD INVESTIGATORS. TEP WAS CONTACTED TO TURN OFF POWER, BREAKERS WERE FOUND FROZEN IN THE ON POSTION SO POWER WAS CUT AT THE POLE. BECAUSE OF THE FIRE DAMAGE, TPD ASKED S/W GAS TO TURN THE GAS OFF AND PIN THE METER, METER WAS PINNED. WATER WAS SHUT OFF AT THE HOSE BIBB WHERE WATER ENTERED THE STUCTURE DUE TO A BROKEN WATER LINE UNDER THE PORCH LINE. STRUCTURE WAS A TOTAL LOSS, MY FINDINGS WERE AS FOLLOWS: STRUCTURAL: REAR PORCH STRUCTURE WAS COMPLETELY FIRE DAMAGED. ROOF SHEATHING, RAFTERS, BEAMS AND POSTS RECEIVED HEAVY FIRE DAMAGE. ROOF SHEATHING WAS ACTUALLY GONE. FOUR ROOMS THAT LINED THE SOUTH SIDE OF THE STRUCTURE AND THE HALLWAY TO THE ROOMS RECEIVED HEAVY FIRE DAMAGE AS WELL AS THE BATHROOM. KITHEN AND LIVINGROOM RECEIVED VERY HEAVY SMOKE DAMAGE. STRUCTURE WAS COMPLETELY SECURED BY BOARD UP. ELECTRICAL: ELECTRICAL SERVICE PANEL, A 2ND 12 X 12 JUNCTION WERE COMPLETELY FIRE DAMAGED THE HALLWAY AND BEDROOM WIRING IN ALL ROOMS, SWITCHES, OUTLETS, AND FIXTURES WERE FIRE DAMAGED, NEAR TPOTAL LOSS TO THE ELECTRICAL. PLUMBING: PLUMBING PIPES ALONG THE REAR WALL AND IN THE BATHROOM RECEIVED HEAVY FIRE DAMAGE. FIXTURES ALSO FIRE DAMAGED. COOLING/ MECHANICAL: DUCT WORK IN THE DORPPED CEILING OF THE HALLWAY RECEIVED HEAVY FIRE DAMAGE. COOLER ALSO FIRE DAMAGED. EMERGENCY VACATE NOV WAS ISSUED AND PERMITS REQUIRED INCLUDED IN THE NOV. OWNER SIGNED FOR THE NOV. "DO NOT ENTER, UNFIT TO OCCUPY" PLACARDS WERE POSTED ON THE BOARDED FRONT WINDOWS. RED CROS WAS CONTACTED FOR THE OWNER AND ARRIVED BEFORE I LEFT. COMPLIANCE / CLOSE CASE. |