Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you cannot find what you are looking for please submit a records request.

Case: T22DV05651

Parcel: 140212180

Inspection Status: Approved

Inspection History: INSP - INITIAL CODE ENFORCMENT

Date Description Inspector Results Comments
10/02/2022 INSP - INITIAL CODE ENFORCMENT Approved Communication called that T.F.D. on site with a structure fire with an explosion. Arrived with inspector Bigmen and the units were clearing the site. The fire investigators were on site checking for cause. The explosion was in a mobile home and the roof has been lifted due to has sprayed insulation on the ground from the mobile home setting on the ground level on the exterior of the mobile home. The meter has been turned off to the electrical and gas due to the amount of damage to the mobile home. The gas has passed the line test and the survey and will not need a permit for re-connect once the electrical is turned back on. The electrical will need a permit to be turned back on. The investigators are checking for cause. Owner of trailer transported to hospital for burns. The fire investigators completed the investigation and T.P.D. is getting a warrant to check on other issues and will call when completed. Will call when done. RV.