Inspection History Details
Inspection Status: Approved
Inspection History: INSP - FOLLOW UP CODE ENFORCE
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 07/21/2022 | INSP - FOLLOW UP CODE ENFORCE | Approved | CONTACTED THE MAINTANENCE PERSON WHO INFORMED ME HE HAS COMPLETED THE REPAIRS. HE REPLACED THE METAL STRAP OVER THE CUT OPENING THAT PROTECTS THE PEX LINE, HE REPLACED THE INSULATION AND THE DRYWALL, TAPED TEXTURED AND PAINTED. I THEN CONTACTED THE OCCUPANT, SHE CONFIRMED THE WORK WAS COMPLETED AND THAT SHE WAS SATISFIED WITH THE JOB. THERE ARE NO FURTHER ISSUES. NOV WAS NOT ISSUED DUE TO WORK IN PROGRESS. COMPLIANCE / CLOSE CASE. |
|
| 07/19/2022 | INSP - FOLLOW UP CODE ENFORCE | Approved | REVISITED SITE, DID FIND THAT MAINTANENCE HAD BEEN BY TO MAKE THE REPAIRS TO THE PEX WATER LINE. THE LEAK WAS NEAR THE CEILING ON THE EAST ENTRY WALL. MAINTANENCE CUT A OPENING IN THE DRYWALL AT BOTH THE TOP AND BOTTOM TO ALLOW SPACE TO DRY OUT. MAINTANENCE STATED THEY WOULD BE BACK TO COMPLETE THE DRYWALL ON WEDNESDAY/ THURSDAYBUT FIRST ALLOW TIME FOR SPACE TO DRY. I EXPLANED HE WOULD NEED A GANG PLATE PLACED OVER THE PIPE AT THE TOP OF THE WALL AND ASKED THAT WET INSULATION BE REPLACED PRIOR TO CLOSING THE OPENING. |