Inspection Status: Approved
Inspection History: INSP - INITIAL CODE ENFORCMENT
| Date |
Description |
Inspector |
Results |
Comments |
| 06/21/2022 |
INSP - INITIAL CODE ENFORCMENT |
|
Approved |
UPON ARRIVAL, THERE ARE TWO MAIN SERVICE PANELS FOR THE DUPLEX AND THE GUEST HOUSE ON THE PROPERTY. ONE SERVICE PANEL HAS BEEN GUTTED AND THE OTHER HAS UNAPPROVED WIRING METHODS TO ENERGIZE THE GUTTED PANEL IN A HAZARDOUS MANNER. THE INTERIOR OF THE DUPLEXES HAS NON-METALLIC SHEATHING, EXTENSION CORDS AND OTHER CABLES BEING USED TO TRANSFER ELECTRICITY OVERHEAD THROUGH THE DUPLEXES. THE CONNECTIONS TO CONNECT CORDS TOGETHER ARE NOT PROTECTED LEAVING THE WIRES EXPOSED WHILE ENERGIZED. TEP HAS TERMINATED POWER AT THE WEATHER HEAD TO PREVENT FURTHER TAMPERING OF THE ELECTRICAL INFRASTRUCTURE. ALL UNITS HAVE BEEN POSTED UNFIT TO OCCUPY UNTIL PROPER PERMITS HAVE BEEN OBTAINED AND ALL NON-CODE COMPLIANT ELECTRICAL MODIFICATIONS HAVE BEEN CORRECTED. OWNER ONSITE HE WILL SECURE PROPERTY AND ACKNOWLEDGED ALL DOCUMENTS CLOSING CASE. |