Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you cannot find what you are looking for please submit a records request.

Case: T22DV01450

Parcel: 132111910

Inspection Status: Approved

Inspection History: INSP - INITIAL CODE ENFORCMENT

Date Description Inspector Results Comments
02/23/2022 INSP - INITIAL CODE ENFORCMENT Approved UPON ARRIVAL THE MASONRY DUPLEX ROOF ASSEMBLY HAS COMPLETELY BURNT AND IN MULTIPLE AREAS COLLAPSED. THERE IS EXTENSIVE AMOUNT OF DRY WALL AND INTERIOR WOOD FRAMING DAMAGE.

ELECTRICAL: LARGE AMOUNT OF THE ELECTRICAL INFRASTRUCTURE HAS MELTED INSIDE AND OUTSIDE OF THE DUPLEX. TO INCLUDE THE MAIN SERVICE PANELS. THE SERVICE DROP HAS BEEN REMOVED BY T.E.P.

PLUMBING: FIRE DAMAGED, SWG HAS REMOVED THEIR EQUIPMENT AND TERMINATED THEIR SERVICE AT THE REAR ALLEY WAY.

MECHANICAL: FIRE DAMAGED, HVAC SYSTEM HAS ENDURED EXCESSIVE HEAT AND HAS SIGNS OF DAMAGE

POSTED UNFIT TO OCCUPY, CITY CONTRACTOR CALLED TO SECURE VIA BOARD AND FENCE. OCCUPANTS ON SITE SIGNED NOTICE AND ORDER. CLOSING CASE.