Permit: T22CM08173

Parcel: 11508090A

Inspection Status: Not Ready

Inspection History: COT - FCON - Sprinkler - Final

Date Description Inspector Results Comments
COT - FCON - Sprinkler - Final Not Ready
COT - FCON - Sprinkler - Final Not Ready
COT - FCON - Sprinkler - Final Not Ready
11/27/2024 COT - FCON - Sprinkler - Final Re-inspection required FDC shall be added per plan, fire bell shall be added per plan. Overhead piping was never inspected by TFD Contractor needs to provide Contractor’s Material and Test Certificate for Aboveground Piping.
01/28/2025 COT - FCON - Sprinkler - Final Passed