Permit: T22CM08169

Parcel: 141191830

Inspection Status: Not Ready

Inspection History: COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in.

Permit Number - T22CM08169

Inspection Description - COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in.

Inspection Status - Not Ready

Date Description Inspector Results Comments
01/16/2026 COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. Not Ready 01/16/2026
Not ready for intermediate inspection. Verified contractor is proceeding with the demolition plan and cleanup work on progress areas of roof fire with significant structural damage. Call in framing and roof inspection when ready and ensure the space is free from debris and allow access to all areas for inspection with in the scope of work. Provide truss calc documentation at framing and roof inspection.
02/06/2026 COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. Not Ready 01/16/2026
Not ready for intermediate inspection. Verified contractor is proceeding with the demolition plan and cleanup work on progress areas of roof fire with significant structural damage. Call in framing and roof inspection when ready and ensure the space is free from debris and allow access to all areas for inspection with in the scope of work. Provide truss calc documentation at framing and roof inspection.

2.6.26
Not ready. Next reinspection required will result in fee.
Demo has not been completed.
No contact - inbox has not been set up
Site is unsuitable/hazardous for inspection. Debris blocks access and damaged areas inside remain, creating a hazardous environment.