Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Inspection History Details
Inspection Status: Not Ready
Inspection History: COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in.
Permit Number - T22CM08169
Inspection Description - COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in.
Inspection Status - Not Ready
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 01/16/2026 | COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. | Not Ready | 01/16/2026 Not ready for intermediate inspection. Verified contractor is proceeding with the demolition plan and cleanup work on progress areas of roof fire with significant structural damage. Call in framing and roof inspection when ready and ensure the space is free from debris and allow access to all areas for inspection with in the scope of work. Provide truss calc documentation at framing and roof inspection. |
|
| 02/06/2026 | COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. | Not Ready | 01/16/2026 Not ready for intermediate inspection. Verified contractor is proceeding with the demolition plan and cleanup work on progress areas of roof fire with significant structural damage. Call in framing and roof inspection when ready and ensure the space is free from debris and allow access to all areas for inspection with in the scope of work. Provide truss calc documentation at framing and roof inspection. 2.6.26 Not ready. Next reinspection required will result in fee. Demo has not been completed. No contact - inbox has not been set up Site is unsuitable/hazardous for inspection. Debris blocks access and damaged areas inside remain, creating a hazardous environment. |