Inspection History Details
Inspection Status: Re-inspection required
Inspection History: RSBU - Building Progress
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 10/20/2023 | RSBU - Building Progress | Re-inspection required | 10/3/23: 9 Footing for masonry columns per plan ok to pour 10/10/23: rebar to schedule okay to grout first lift 10/19/23: 1st lift grouted without #3 column ties @8" max per plan, the 2nd lift inspection only shows two #4 vertical rebar and no column ties. |
|
| 10/27/2023 | RSBU - Building Progress | Passed | Pre-slab. |