Inspection History Details
Inspection Status: Not Ready
Inspection History: COT - RSEL - Electrical Final
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 10/27/2022 | COT - RSEL - Electrical Final | Not Ready | ||
| 03/15/2023 | COT - RSEL - Electrical Final | Partial Pass | TEP tech given verbal clearance on site, and called into TEP at 2:30. Inspection partialled for future use on solar. |
|
| 03/20/2023 | COT - RSEL - Electrical Final | Re-inspection required | Denied, equipment installed is not per approved plan on site, reinspection required | |
| 05/09/2023 | COT - RSEL - Electrical Final | Re-inspection required | 8/9 - need revision, correction of MSA and main disco sizes. | |
| 05/11/2023 | COT - RSEL - Electrical Final | Passed |