Inspection History Details
Inspection Status: Not Ready
Inspection History: COT - RSME - Mechanical Final
Permit Number - T22CM07730
Inspection Description - COT - RSME - Mechanical Final
Inspection Status - Not Ready
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
10/27/2022 | COT - RSME - Mechanical Final | Not Ready | ||
04/13/2023 | COT - RSME - Mechanical Final | Not Ready | Not ready A/C for office area is not connected nor energized along with missing caps. 4/13/2023 | |
04/14/2023 | COT - RSME - Mechanical Final | Passed | 4-14-23: A/C Unit is connected and energized for office area. Yard water line is connected and under pressure. Chad Ritter has it turned off at meter to prevent people from using the facilities inside until 4-24-23 when they should have permission to use sewer. Okay to issue a temporary Level 2 Certificate of Occupancy. |