Inspection History Details
Inspection Status: Not Ready
Inspection History: COT - LCBU - Framing
Permit Number - T22CM07688
Inspection Description - COT - LCBU - Framing
Inspection Status - Not Ready
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
10/27/2022 | COT - LCBU - Framing | Not Ready | ||
03/28/2023 | COT - LCBU - Framing | Not Ready | Not ready missing shear walls in multiple places. Add anchor bolts were needed. Add continuous studs to support double truss. Add double studs under gable trusses first floor. Missing rsp clips. Double check nailing on belly band. 3/28/2023 | |
03/30/2023 | COT - LCBU - Framing | Partial Pass | partial per intermediates. 3/30/2023 | |
04/20/2023 | COT - LCBU - Framing | Not Ready | ||
04/21/2023 | COT - LCBU - Framing | Passed | Approved. Corrections were made. 4/21/2023 |